logo

Blog
  1. Home
  2. Blog
  3. Huntly Ore Conveyor Construction

Huntly Ore Conveyor Construction

Huntly coal conveyor construction An additional overland conveyor was required when the Huntly mining operations were relocated 10 km further from the Pinjarra refinery The new conveyor has to be available 247 The maximum ambient temperature is 45 176C and there is no cooling water available onsite

Send Email:[email protected]

Leave Message Chat Online